• Under Construction

    Marquee Board: The marquee was installed during the summer of 2024, and unfortunately, it was damaged.  A new board is in the process of being installed.

    In Planning

    New Multipurpose Room, New Outdoor Quad Area, New Administration Building: Quattrocchi Kwok Architects (QKA) are working with the site facilities committee to finalize the design. QKA intends to submit plans to the Division of the State Architect (DSA) in December 2024. Construction is expected to begin in the summer of 2025. In addition to these major changes to the campus, Crocker Middle School will also have a new Culinary Arts classroom and a new Makerspace classroom.

    Rendering of Crocker MPR  Crocker Rendering2

    Roofing and HVAC: The district is working with architects and engineers to prepare for the new roofs and HVAC units at Crocker. Architectural drawings will be submitted to DSA in December 2024. Construction is expected to begin in the summer of 2025.

    Crocker Field Upgrade: The Facilities and Construction team continues its work on the Crocker Field project. The Board of Trustees approved the contract with Verde Design for the architectural services on this project. In October 2023, a topographic and underground survey was completed to help determine the placement of the field's design elements. Also, a geotechnical hazards report was completed in November 2023. The team is forming design committees to meet with the architect to develop the project's design. 

    Fire Alarm Upgrade: Our Fire Alarm System Project is currently in the design initiation phase. New systems will be installed on the Crocker Campus during the summer of 2025.

    Security Camera Pilot Program: HCSD is working directly with Verkada Security Systems to install security cameras on all campuses and at the District Office. Cameras will first be installed on the Crocker campus. The expected date of installation is February 2025.

    Completed

    Image of a SmartboardClassroom Technology: During the summer of 2023, SmartBoards were deployed into each classroom on the Crocker campus. All teachers received training on using the new SmartBoards and implementation is taking place across all classrooms.

    UPS Upgrades: The District replaced its Uninterruptible Power Supply (UPS) systems with network technology to provide critical power backup for each site to keep the network functioning and allow it to safely be powered down despite power failures.